top of page
image_edited_edited.png

...when you need 24/7 power out here with no batteries ...

image.png

Ai Data Centers have a $100B problem, we solve it with Solar Thermal @50% Lower Cost than gas, PV or wind and batteries!

 

​​​ONE SYSTEM - TWO SOLUTIONS : POWER & COOLING INTEGRATED & 'NEXT TO ZERO' WATER CONSUMPTION

Ai REPRESENTATIVE IMAGE

image_edited.png

What is Terrajoule Energy, isn’t Terrajoule just “CSP”?
 

NO
Terrajoule is A-CSP, the 'Anti-CSP'

​

Commonalities

Both have mirrors, that's it.

​

Terrajoule A-CSP is:

Prefabricated offsite mass-produced,modular

Automated installation

ZERO Degradation

ZERO Slave Labour

 

What you know about conventional CSP does not apply to the A-CSP, not even close!

50% Lower Cost with Zero Degradation One System – Two Solutions; Power & Cooling Integrated
Mine energisation costs without diesel....

                               Data Centres                            Remote Mine Sites                              

If you are marketing 'Green' Hydrogen or Amonioa and using soalr panels and wind to do so, you are NOT prodcuing a 'green' product.
Green Steel Manufcature

                 Green Hydrogen Plants                         Green Steel Manufacture           

Gas field
Large scale dairy and agricultral industry
Towns currenlty runing on dieslel can be taken off diesel and you dont need to connect to the grid!

     UN Economic Development Programs                                              Gas Plants                                    

           Remote Towns & Infrastructure                      Large Scale Dairy Manufacturing Plants    

image_edited.jpg

                                                                   Desalination Plants                                                   

  • 100% Renewable Commitment: Both the Sydney and Victorian plants in Australia are mandated to be 100% renewable-powered.
  • Direct Sourcing: Sydney’s plant is primarily powered by the Capital Wind Farm, which produces three times the power the plant actually needs.
  • Renewable Energy Certificates (RECs): To maintain a 24/7 supply, plants often draw from the general grid and "offset" 100% of their usage by purchasing and retiring Renewable Energy Certificates.
  • Challenges: The main hurdle for reaching 90%+ purely from on-site renewables is intermittency (the sun setting or wind stopping). Solving this requires expensive battery storage or "load-shaping"—ramping water production up when the sun is shining and down at night.
TERRAJOULE SOLVES THIS ISSUE

Terrajoule Energy Australia is a Subsidiary of Larnach Ventures ABN 991 371 99090

bottom of page